Projects
Maxima Office Furniture Fit Outs
ZenT White Frame chairs fitted beautifully with the colour themeas well as the orange mesh chairs
Mission Australia Office Fit Outs
Using our Act1 leg and new track screens system for the open plan area with monitor arms and flush in desk power & data boxes.
BASF Office Furniture Fit Out
BASF awarded AOI the contract to fit out their new project. They produced their own ideas and drawings
L & M Radiators Office Fit Out
L & M Radiators required a complete fit out of office furniture for their new premises project in Perth.
Garuda Perth Office Fit Out
Complete Office Fit Out, demolition, walls, ceilings, plumbing, electrical, data, stone, wood veneer, flooring, signage, frosting, custom furniture and seating, T80 screen system.
Papas Trailers Reception Counters
Papas Trailers moved to new premises and required now reception and service counters for their showroom, they loved the look of the custom desk we did for Apollo Campers, so we designed all their counters to suit.
Lysaght Office Fit Out Perth
2 story building refurbishment & complete office fit out including – Demolition, new vinyl and carpet tiles including stairwell
Roy Hill Office Furniture Fit Out
114x 120° ZenT80 workstations with whiteboards and pinboards- 120° Sit Stand Desks – integrated softwiring – Tambour Door Storage – Bridge Chrome Leg meeting and boardroom tables
Tennis West Office Fit Out Perth
New 100% recycled back Eco Floor Carpet – Custom gloss white reception desk with stone top – Signage – Custom glass display cabinets with lighting
Thejo Australia Office Fit Out
Thejo were looking for a classic look to complement their corporate colours in their new premises in Bibra Lake.
Zenith Pacific Office Fit Out
Office fit out in 2 locations using T80 Screen System, ACT1 desk frames, Bridge Leg system with Straight Grain
A.M.O.U. Office Furniture Fit Out
The Australian Maritime Officers Union required a small office to be fitted out in Fremantle.
Perth Mint Complete Office Fit Out
Perth Mint required space for potentially 90 staff in one area in an open plan arrangement. With a lot of creative design and layouts we were able to identified a floor with a mezzanine that would be suitable with enough space to fit
